Front & back end cycle

With 40 years experience in front and back end cycles in the nuclear industry, as far as the dismantling process.

REEL supplies handling equipment and complete systems for the front and back end cycles in nuclear power plants, as well as for laboratories and research reactors. Within these fields, the environmental restrictions on irradiated media render direct interventions on or around the equipment impossible.

REEL has built up a solid foundation of experience, under all conditions, to guarantee the functioning and repair of equipment within the irradiated zone. Our solutions take into account the strict design requirements (safety, containment, radiological protection, the release of heat, space and reduced access) as well as operational restrictions (operational safety, accurate positioning, automated remote control, ability to undertake repairs, integrated logistical support).

Front end fuel cycle

REEL provides process and handling equipment for uranium enrichment and fuel manufacturing installations.

References:

  • GB2 plant, AREVA’s new plant, designed to enrich and manufacture MOX fuel.
  • Hot cell lifting unit.
  • Semi-polar crane for experimental chamber and vacuum boxes for the LMJ installation’s laser lines run by the CEA/DAM.

 

Back end fuel cycle

REEL produces process and handling equipment for re-processing sites as well as lifting units for hot cells in installations used for the packaging, treatment and storage of nuclear waste.

This equipment is based upon proven technologies in order to provide the highest possible levels of availability in difficult operating conditions with extremely restricted access. These technologies require the reliability and redundancy of components, their compatibility with irradiated environments and electro-magnetic compatibility.

An important part of the design involves monitoring and system automation. The equipment is controlled jointly by hard-wired logic and programmable electronics (PLCs, controllers, digital systems). REEL closely monitors future developments of all software used.

References:

  •  Nuclearized cranes for the dismantling of the Phénix fast breeder reactor and the high level waste silo in the La Hague reprocessing plant.

IMECA supplies fast traveling pipe loading crane in primary process of ALLSEAS’s pioneering spirit

The assembly, installation and commissioning were executed in close cooperation with Allseas under IMECA supervision.

Our 360° VR application on the aluminium exhibition in Düsseldorf

Customers were delighted to explore our shipunloader or special cranes through our 360° VR application

Some news of Iter project progress

Assembly Hall One giant standing

REEL participate to the development of the LCA60T project,

REEL will provide the 12 winches that will equip the airship and will lift or drop 60 tons of cargo